Frequently asked questions

Here are some common questions about our company.

You can also enter your email below for updates as we approach launch.

Thanks for registering!

Right now we plan to start pilots towards the end of 2026. This will run concurrently with the last obstacle, which is 3rd party validation and certification (e.g. UL, IEC, SWCC). Sales start as soon as this can be accomplished.

The commercial turbine is expected to be between 10-15 ft (3-4.5 m) tall. A future residential turbine is expected to be around 4-5 ft (~1.4 m) tall.

Final specs need a completed, fully engineered turbine which is expected towards the end of Q4. When we have specs that can be responsibly released, we'll let our newsletter subscribers know them as they come (you can sign up on this page).

The last iteration validated 2 kW but our target is 6-13 kW for the design. There are a few technical milestones to check off before we're certain enough to change our estimates.

The currently validated 2 kW rating can be improved with changes to two main things: 1) the blade's sweep area and 2) the technical scope required to validate more complex parts of the design (i.e. more time and cost). An increase to the both of these could have the turbine's final rating at 6-13 kW.

Final materials depend on the strength and durability requirements shown in the final engineering of the turbine, as well as manufacturability, weight, etc. Top contenders right now are carbon fiber, sheet metal, fiberglass, or possibly something like blow molded plastic for the smaller residential model.

The milestones at the bottom of the "Our Turbine" outline the milestones left. In short: 1) a final refinement of the design, 2) commercial-grade prototype fabrication, 3) concurrent projects for certifications and pilot programs. Commercialization can technically begin after safety certifications, but we'll need to see how all #3 projects stack up.

Rooftop solar installers interested in adding our turbines to their offerings can sign up below. We will notify you when fully engineered specifications are released, which we expect in late 2026.

Installer Interest

We are "testing the waters" to gauge investor interest in an offering under Regulation Crowdfunding. No money or other consideration is being solicited. If sent, it will not be accepted. No offer to buy securities will be accepted. No part of the purchase price will be received until a Form C is filed and only through StartEngine's platform. Any indication of interest involves no obligation or commitment of any kind.

This email contains forward-looking statements, including, but not limited to, statements concerning our business strategy, the performance of our technology, market opportunity, and future plans. Words such as “expect,” “believe,” “project,” “plan,” “positioned to,” and similar expressions are intended to identify forward-looking statements.

 These statements are based on our management's current beliefs and assumptions and are not guarantees of future performance. They are subject to known and unknown risks, uncertainties, and other factors that could cause our actual results to differ materially from those expressed or implied by these statements. A comprehensive discussion of these risks will be included in our Form C offering statement should we proceed with an offering. We undertake no obligation to update any forward-looking statements to reflect events or circumstances after the date of this email. Investors are cautioned not to place undue reliance on these forward-looking statements.